Town of Halfmoon Water Improvement

Town of Halfmoon Water Improvement

Client: Town of Halfmoon
Location: Halfmoon, NY
Design: Clough Harbor & Associates (CHA)
Market: Municipal
Service: General Construction

Project Profile

The expansion of the existing water treatment facility doubled output to 4 million gallons per day. The new 7,500 square foot pre- engineered steel structure also had two new 2MGD ACTIFLOC Modular Enhanced Conventional Treatments Units added to it. Other new features include new chlorinations and chemical feed systems, three 500hp high- capacity vertical turbine pumps, two 100hp backwash pumps, and two new 75hp pumps at the existing Raw Water Pump Station. There is also a new Instrumentation system with interconnection to the existing SCADA control system. Improvements were also made in the security access system throughout the existing and new facilities, and also in the site itself to improve storm runoff and traffic around the plant.

Project Gallery